PROJECT |
DOCUMENTS |
DEADLINE |
NPT Dept. of Technology RFP to Keep Full Generator Fuel for 21 Remote Generator Sites | NPT Dept. of Technology RFP to Keep Full Generator Fuel for 21 Remote Generator Sites | April 11, 2025 by 4:00 PM (PDT) |
Nez Perce Tribe Hatchery HVAC Upgrade | RFP | April 30, 2025 by 4:30 PM (PDT) |
Red River Meadow, River, & Floodplain Conceptual Design | RFP | May 2, 2025 |
Nimiipuu Energy | Technical Solar Energy System Plan | May 4, 2025 by 6:00 PM (PDT) |
Nimiipuu Energy | Geographic and Site Suitability Analysis for Renewable Energy Development | May 4, 2025 by 6:00 PM (PDT) |
Nimiipuu Energy | Engineering Resilient Energy Infrastructure Pathways | May 4, 2025 by 6:00 PM (PDT) |
Nimiipuu Energy | Financial Modeling and Feasibility Assessment for Energy Technologies in the Columbia River Basin | May 4, 2025 by 6:00 PM (PDT) |
Nimiipuu Energy | Renewable Energy Feasibility Assessment | May 4, 2025 by 6:00 PM (PDT) |
Nimiipuu Energy | Legal Services | May 4, 2025 by 6:00 PM (PDT) |
Nimiipuu Energy | Accounting and Tax Advisory Consultant | May 4, 2025 by 6:00 PM (PDT) |
Nimiipuu Energy | Technical Analyst Consultant | May 4, 2025 by 6:00 PM (PDT) |
Nimiipuu Energy | Business Analyst Consultant | May 4, 2025 by 6:00 PM (PDT) |
Nimiipuu Energy | Manager Consultant | May 4, 2025 by 6:00 PM (PDT) |
Nimiipuu Energy | Engineering Consultant & Owner’s Representative | May 4, 2025 by 6:00 PM (PDT) |
Indian Grave Creek Confluence Realignment **Note: Despite the creek name, there are NO Indian graves associated with this site, it is simply the name of the creek. | RFP Final Design Technical Specifications | May 5, 2025 by 2:00 PM (PDT) |
Musselshell Bridge Replacement | RFP Supplemental Specifications Construction Plans | May 5, 2025 by 2:00 PM (PDT) |